PRODUCTION

Gatchina

Leningrad Region

4000 m² production area

Capacity up to 9,000,000 l/year

Tank farm for storing solvents from 150 to 300 m³

Tank farm for storing resins

Modern engineering systems

Modern equipment

WAREHOUSE

CONVENIENT LOCATION

availability of warehouses in
low traffic areas
in the northern and southern parts of the city

COLORING

• Primers and large batches of topcoats are produced in full batches at the production facility

• Availability of modern tinting equipment allows to produce up to 1000 liters of tinted materials per day

STORAGE

• Main warehouses for raw and finished products are located in St. Petersburg

• Total area of warehouses is 2000 m²

• Possibility to store buffer stock of raw materials for 5-6 months (120-150 t. l)
and finished products for 3 months (120-150 t. l)

• State-of-the-art equipment for loading/unloading materials

SHIPMENT

• The company is capable of shipping up to 5-6 orders (trucks) per day

• The company is capable of fulfilling the orders for shipment of standard products (MTS)

• within 2-3 days of tinted and specialty products within 7-10 days